BMP Test Options

There are two methods for assessing biochemical methane production potential (BMP) of wastewaters or chemicals that are candidates for anaerobic treatment.   One is a 28-d test developed by Owen et. al. (Water Research, V. 13, 1979), and the second method was developed by RSA (Young J.C. and Cowan, R M. Respirometry for Environmental Science and Engineering, 2004). Both protocols use the PF-8000 anaerobic respirometer for measuring gas flow as illustrated below:

OPTION I:  28-d Single-Feed BMP

  1. Four to six test reactors (sealable bottles having 200 to 500 mL capacity, or other volumes as desired) are prepared and flushed with nitrogen gas before and after filling with the desired amount of test inoculum (usually 1 to 3 g VSS per bottle).
  2. The desired amount of test wastewater or chemical is added to each bottle – along with nutrients and trace minerals – and the bottles are incubated at 35oC for up to 28 days.
  3. pH, sCOD, TSS, VSS, NH3-N and other desired parameters are measured on days four and seven and weekly thereafter.
  4. Total and/or methane gas production are measured at desired intervals (ideally daily) for the 28-d test duration using a PF-8000 anaerobic/aerobic respirometer and the methane production per gram of COD added is calculated. The maximum is 395 mL/g COD for 100% conversion of COD to methane. Example results are shown on the graph below. A more detailed test plan is available from RSA.
Example single-dose BMP test results through 24 days of operation.
Example single-dose BMP test results through 24 days of operation.

OPTION II:  Daily Fed BMP

The daily-fed BMP method developed by RSA involves daily addition of test wastewater or chemical to test reactors for a minimum of 10 days.   The objective is to document the hourly methane production rates for each test reactor.   The test protocol is as follows:

  1. The desired number of test bottles are prepared (usually 700 mL sealable bottles containing 500 mL of anaerobic inoculum at 2,000 to 5,000 mg VSS/L; but other volumes can be used).
  2. A planned quantity of culture volume is wasted daily from each test reactor. This usually involves removing sufficient volume to achieve the solids retention time at which the proposed anaerobic reactors will be operated, or over a range of SRTs. For example: 20, 30, and 45 days.
  3. The same amount of test wastewater – along with nutrients and trace minerals – is fed to each reactor as was wasted.
  4. pH, sCOD, TSS, VSS, NH3-N, VFAs and other desired parameters are measured on days four and ten.
  5. A PF-8000 anaerobic/aerobic respirometer is used to measure total gas and/or methane production on an hourly basis (see example data below for operation at 20, 30 and 45-d SRTs).
700 Research Center Blvd Suite 1403 | Fayetteville, AR 72701 | Phone: 479-236-5413 | | Privacy Policy